TCE Men's Hostel, completed — SIRPI Builders, Madurai
Case study · Thiagarajar College of Engineering

≈ ₹81 lakh saved — about a fifth — on the Men's Hostel — E Block.

An ≈ 18,000 sq ft hostel for Thiagarajar College of Engineering, delivered on the open-book model against a conventional tender of ≈ ₹4.38 Cr — with an ≈ ₹10 Cr hostel (ongoing) now underway.

≈ ₹81 lakh

saved vs the tender

≈ 18%

of the conventional price

≈ 18,000 sq ft

Men's Hostel, E-Block

3 yr

defect liability

The brief

An institution that values every rupee.

Thiagarajar College of Engineering — part of the wider Thiagarajar group — needed a new Men's Hostel block built to institutional standards, on a public-institution budget, with full accountability for where the money went.

A conventional lump-sum tender would have priced the work at roughly ≈ ₹4.38 Cr — a number that bundles in contingency padding, mark-ups and the room for inflated variation claims.

SIRPI proposed the open book instead: build on measured actuals, charge a single honest fee, and report every cost vertical transparently. The institution would see exactly what the building cost — and pay for that, not for padding.

Tender vs the open book

The same building, a fifth less.

Conventional lump-sum tender≈ ₹4.38 Cr
Delivered on the SIRPI open book≈ 18% less
Actual cost of works + honest fee
≈ ₹81 lakh≈ 18% below the tender — and that's net of our management fee, which sits inside the delivered cost, not on top of it.

How the saving was measured.The institution's own tendered lump-sum price for the same scope, set against the final reconciled actual-cost-plus-fee that SIRPI delivered — both reconciled against the project's cost record.

Headline outcome only. SIRPI never publishes the line-item cost breakup or any client's contract detail.

Watch it built · 2023 → 2025

Every stage, on the record.

Scrub the real construction. At each milestone the open book is at work — actuals-based billing, stage-gated recovery, premium materials, and a final vertical-wise cost report.

TCE Men's Hostel construction, 20231226
Loading frames…
26 Dec 2023
Site & foundation

Actuals-based billing begins — you pay for real quantities, not a padded lump sum.

2023TCE Men's Hostel2025
The completed hostel

Built, finished, handed over.

Inside the delivered Men's Hostel — the daylit central atrium under its barrel-vault skylight, finished colonnades and corridors, balcony elevations and the fitted-out study rooms, photographed on completion.

TCE Men's Hostel — completed interior & finishes
01Completed
TCE Men's Hostel — completed interior & finishes
02Completed
TCE Men's Hostel — completed interior & finishes
03Completed
TCE Men's Hostel — completed interior & finishes
04Completed
TCE Men's Hostel — completed interior & finishes
05Completed
The result

A building, and a benchmark.

The hostel was delivered to institutional standards with ≈ ₹81 lakh — about ≈ 18% — saved against the conventional tender, every vertical itemised and reconciled in a final cost report. The open book turned a budget line into a benchmark.

The next chapter · under execution

A second hostel, now rising.

On the strength of that result, an ≈ ₹10 Cr hostel is now under execution for the same institution — the same open-book model, at a larger scale. Shown here in its design render, ahead of the photographs to come.

TCE ongoing hostel — architectural 3D render
3D render · under execution
TCE ongoing hostel — architectural 3D render
TCE ongoing hostel — architectural 3D render
TCE ongoing hostel — architectural 3D render
TCE ongoing hostel — architectural 3D render

Want this kind of transparency on your project?